VinPropane
018c8a7466
Merge pull request #99 from ViPro-Technologies/NEO-65-e3m2-prototype-recipedef-catalog-schemas-ci
...
NEO-65: E3.M2 prototype RecipeDef catalog + schemas + CI
2026-05-24 16:36:11 -04:00
VinPropane
27ec7c02a7
NEO-65: Replace deprecated RefResolver with referencing.Registry.
...
Use jsonschema 4.22+ registry API for cross-file recipe schema $ref
resolution (Bugbot PR #99 ).
2026-05-24 16:31:24 -04:00
VinPropane
d4a4795eb1
NEO-65: Address code review doc alignment and NEO-66 sync note.
...
Bump E3.M2 module status to In Progress with NEO-65 snapshot; add
PROTOTYPE_SLICE3_RECIPE_IDS kickoff reminder for E3M2-02; strike through
resolved review suggestions.
2026-05-24 16:25:49 -04:00
VinPropane
966c54ac74
NEO-65: Add code review for RecipeDef catalog + CI.
2026-05-24 16:23:25 -04:00
VinPropane
b4f27b4a18
NEO-65: Document recipe catalog CI and mark E3M2-01 complete.
...
Update CT.M1 PR gate, E3.M2 freeze rules, alignment register, and backlog
checkboxes after prototype recipe validation lands.
2026-05-24 16:21:46 -04:00
VinPropane
4c82283bbc
NEO-65: Add prototype recipe catalog, schemas, and CI gates.
...
Lock eight frozen RecipeDef rows with JSON Schema validation, duplicate-id
rejection, Slice 3 allowlist, and cross-checks against item and skill catalogs.
2026-05-24 16:21:44 -04:00
VinPropane
b4b8536081
chore: codify full-stack epic decomposition policy
...
Add alwaysApply rule, prototype backlog template, epic template updates,
and review/kickoff gates so player-visible slices require client Linear
issues and Godot verification—not Bruno-only deferrals.
2026-05-24 16:19:32 -04:00
VinPropane
2cd17e293a
chore: Epic 3 Slice 5 client backlog and full-stack epic policy
...
Add E3S5-client-prototype-backlog (NEO-72–NEO-75), epic_03 Slice 5,
full-stack epics rule in decomposition README, and cross-links from
E3 module docs and prototype backlogs.
2026-05-24 16:16:51 -04:00
VinPropane
458e9b10e8
NEO-65: E3.M2 Slice 3 decomposition backlog and freeze docs
...
Add E3M2 prototype backlog (NEO-65–NEO-71), eight-recipe freeze table,
content/README Slice 3 CI note, and cross-links in alignment/decomposition docs.
2026-05-24 16:09:50 -04:00
VinPropane
0556d5fa0f
NEO-65: kickoff implementation plan for RecipeDef catalog + CI
...
Lock content shape for eight frozen prototype recipes before server load,
following NEO-50/NEO-57 schema + validate_content.py patterns.
2026-05-24 16:09:38 -04:00
VinPropane
fa7bcce78b
Merge pull request #98 from ViPro-Technologies/NEO-64-e3m1-resource-gathered-gather-node-depleted-telemetry-hooks
...
NEO-64: gather telemetry hook sites (resource_gathered / gather_node_depleted)
2026-05-24 16:02:31 -04:00
VinPropane
a578d9b684
NEO-64: address code review follow-ups.
...
Nest gather_node_depleted hook in remainingGathers == 0 guard,
add E3M1-08 deny-branch out-of-scope note, and give README NEO-64
its own subsection anchor.
2026-05-24 16:00:02 -04:00
VinPropane
1bcaa1b350
NEO-64: add code review document.
2026-05-24 15:59:16 -04:00
VinPropane
847cda97a3
NEO-64: add gather telemetry hook sites and doc updates.
...
Comment-only resource_gathered and gather_node_depleted anchors in
GatherOperations.TryGather; README, module docs, manual QA, and E3.M1
backlog marked complete.
2026-05-24 15:58:29 -04:00
VinPropane
f39d12a093
NEO-64: add implementation plan for gather telemetry hooks.
2026-05-24 15:57:37 -04:00
VinPropane
052dd7bc8a
Merge pull request #97 from ViPro-Technologies/NEO-63-e3m1-interact-path-integration-registry-expansion-bruno
...
NEO-62/NEO-63: GatherResult engine + interact gather wiring
2026-05-24 15:56:10 -04:00
VinPropane
0f846f90b9
NEO-63: fix Bruno depletion test node isolation.
...
Use prototype_urban_bulk_delta so earlier alpha gathers in the
collection do not pre-deplete capacity under CI Postgres persistence.
2026-05-24 15:51:32 -04:00
VinPropane
3834b2316a
NEO-63: address code review follow-ups.
...
AAA depletion test layout, source_kind_not_allowed assertion,
HTTP inventory_full deny test, trim duplicate XP test, doc comments.
2026-05-24 15:46:20 -04:00
VinPropane
35381ad749
NEO-63: add code review document.
2026-05-24 15:45:13 -04:00
VinPropane
01dc48a50a
NEO-63: add plan, manual QA, and doc updates.
...
README gather-via-interact section; E3.M1 anchor coords; backlog landed.
2026-05-24 15:44:15 -04:00
VinPropane
e681857778
NEO-63: wire interact to gather engine and expand registry.
...
Four resource_node anchors; gather denies map to InteractionResponse;
integration tests, Bruno gather/inventory and depletion flows.
2026-05-24 15:44:12 -04:00
VinPropane
f58ab4a2eb
NEO-62: update docs for gather engine landing.
...
README, E3.M1 module doc, alignment table, backlog checkboxes.
2026-05-24 15:41:28 -04:00
VinPropane
f23af01687
NEO-62: add GatherOperations engine and tests.
...
Orchestrates inventory grant, salvage XP, and depletion commit
with compensating rollback on XP failure.
2026-05-24 15:41:26 -04:00
VinPropane
acf9fe125f
NEO-62: add gather engine implementation plan.
...
Kickoff clarifications: inventory → XP → depletion commit order;
compensating inventory rollback on XP failure.
2026-05-24 15:30:27 -04:00
VinPropane
ef5a577c4e
Merge pull request #96 from ViPro-Technologies/NEO-61-e3m1-world-node-instance-depletion-store
...
NEO-61: E3.M1 world node instance depletion store
2026-05-24 15:28:37 -04:00
VinPropane
5dac6b2825
NEO-61: fix null snapshot on depletion deny path.
...
Check TryGetRemainingGathers return before using the out snapshot;
default struct had null InteractableId and threw on .Length.
2026-05-24 15:21:37 -04:00
VinPropane
0cc5bb8925
NEO-61: address code review follow-ups.
...
Fix AAA layout in depletion tests, add ResourceNodeInstanceIds.Normalize,
throw on failed lazy-init after catalog hit, and update dependency register
footnote plus review doc strikethroughs.
2026-05-24 15:15:25 -04:00
VinPropane
0dfbe769e7
NEO-61: add code review document.
2026-05-24 15:13:51 -04:00
VinPropane
6d2d3c040a
NEO-61: add world node instance depletion store.
...
Split IResourceNodeInstanceStore + ResourceNodeInstanceOperations with
lazy init from catalog maxGathers, atomic decrement, node_depleted and
unknown_node reason codes, V006 Postgres migration, and parity tests.
2026-05-24 15:03:05 -04:00
VinPropane
869d411b6f
NEO-61: add implementation plan for node depletion store.
...
Kickoff clarifications adopt split store/operations, lazy init,
keep depleted rows at zero, and defer interactable registry expansion.
2026-05-24 14:59:48 -04:00
VinPropane
4734df1bbc
Merge pull request #95 from ViPro-Technologies/NEO-60-e3m1-get-world-resource-node-definitions-bruno
...
NEO-60: GET world resource-node-definitions + Bruno
2026-05-24 14:58:07 -04:00
VinPropane
2b66df86b8
NEO-60: address code review — register footnote and Bruno comment
...
Extend E3.M1 dependency register note with NEO-57–NEO-60 landed slices;
add StringComparer.Ordinal comment to Bruno ordinal test for parity.
2026-05-24 14:49:15 -04:00
VinPropane
b60920b2e2
NEO-60: add code review document
2026-05-24 14:48:16 -04:00
VinPropane
97f8f31682
NEO-60: add GET /game/world/resource-node-definitions endpoint
...
Versioned read-only projection backed by IResourceNodeDefinitionRegistry
with nested yield DTOs, integration test, Bruno, manual QA, and docs.
2026-05-24 14:47:23 -04:00
VinPropane
78dbf1c454
NEO-60: add implementation plan for resource-node-definitions GET
...
Kickoff plan mirrors NEO-53 item-definitions pattern with nested yield
projection, Bruno, manual QA, and integration tests on IResourceNodeDefinitionRegistry.
2026-05-24 14:44:04 -04:00
VinPropane
878454e3ed
Merge pull request #94 from ViPro-Technologies/NEO-59-e3m1-resource-node-definition-registry-di
...
NEO-59: E3.M1 resource-node definition registry + DI
2026-05-24 14:41:20 -04:00
VinPropane
1e1ca5519c
NEO-59: address code review follow-ups
...
Simplify GetDefinitionsInIdOrder to iterate key-value pairs directly,
avoiding the intermediate sorted-keys array and second dictionary lookup.
2026-05-24 14:31:20 -04:00
VinPropane
dc66b5cef4
NEO-59: add code review document
2026-05-24 14:29:46 -04:00
VinPropane
01dec2b6c8
NEO-59: document registry in README, alignment, and backlog
...
Mark acceptance criteria complete in the implementation plan.
2026-05-24 14:26:23 -04:00
VinPropane
bd43951f80
NEO-59: add IResourceNodeDefinitionRegistry and DI adapter
...
Thin registry over ResourceNodeCatalog with node/yield lookup,
enumeration, and AAA unit + host DI tests mirroring NEO-52.
2026-05-24 14:26:23 -04:00
VinPropane
4921f2c25b
NEO-59: add implementation plan for resource node registry + DI
2026-05-24 14:23:55 -04:00
VinPropane
6748a848af
Merge pull request #93 from ViPro-Technologies/NEO-58-e3m1-server-resource-node-catalog-load-fail-fast
...
NEO-58: E3.M1 server resource-node catalog load (fail-fast)
2026-05-24 14:18:40 -04:00
VinPropane
44fc8d7b62
NEO-58: address code review follow-ups
...
Document optional Bruno smoke in plan; add empty-catalog file loader tests;
tighten host DI test AAA; strike through resolved review items.
2026-05-24 14:04:42 -04:00
VinPropane
6656853473
NEO-58: add code review for resource-node catalog load
2026-05-24 14:03:19 -04:00
VinPropane
fdaf5b7231
NEO-58: note NEO-57 merged and branch rebased on main
...
Update plan after PR #92 ; precursor content is on main.
2026-05-24 14:01:36 -04:00
VinPropane
0384b63046
NEO-58: add fail-fast resource-node catalog load at startup
...
Loader, Slice 2 gates, DI registration, AAA tests, README and plan updates.
Cross-checks yield itemIds against ItemDefinitionCatalog loaded first.
2026-05-24 14:01:29 -04:00
VinPropane
2de699b7bd
NEO-58: add implementation plan for resource-node catalog load
...
Kickoff plan for E3M1-02: fail-fast server loader mirroring NEO-51/NEO-57,
stacked on NEO-57, catalog-only DI until NEO-59 registry story.
2026-05-24 14:01:29 -04:00
VinPropane
8c1e0552b3
Merge pull request #92 from ViPro-Technologies/NEO-57-e3m1-prototype-resourcenodedef-yield-schemas-ci
...
NEO-57: E3.M1 prototype ResourceNodeDef + yield tables + schemas + CI
2026-05-24 14:01:09 -04:00
VinPropane
fba6bff24f
NEO-57: align E3.M1 contract table with two-file content layout
...
Update illustrative fields to match landed node + yield row schemas.
2026-05-24 13:54:42 -04:00
VinPropane
f0a4183598
NEO-57: close review follow-ups on E3M1 backlog and review doc
...
Clarify two-file yield layout in backlog; mark review suggestions
resolved and verdict Approve.
2026-05-24 13:54:36 -04:00