891 B
891 B
Implementation plans (docs/plans/)
Story-level implementation plans live here, keyed by Linear issue id (NEO-*) when the work is tracked in Linear (team NEO, Neon Sprawl).
Legacy NEON-* filenames
A small number of files keep the historical Jira / Atlassian NEON-* key in the filename only. They are not the active issue tracker for new work.
- Each such file includes a short Historical banner at the top pointing at the matching
NEO-*plan (same scope) where kickoff and commits should align. - Prefer opening and linking
NEO-*issues and plans for new contributors.
Conventions
- New or moved plans:
docs/plans/{LINEAR_KEY}-implementation-plan.md(see story kickoff). - Cross-links from decomposition and game-design docs should use
NEO-*URLs (Linear) for current engineering work.