3.1 KiB
Code review — NEO-40 (skill progression telemetry hook sites)
Date: 2026-05-10
Scope: Branch NEO-40-skill-xp-level-up-telemetry-hook-sites vs origin/main (commits through effd234).
Base: origin/main
Follow-up: Suggestions and nits below are done (strikethrough + Done.).
Verdict
Approve
Summary
The branch adds comment-only telemetry hook markers on the authoritative POST …/skill-progression path after a successful TryApplyXpDelta, plus a second marker on the level-up branch. Behavior and JSON contracts are unchanged; documentation (implementation plan, manual QA, E2.M2 module note, Bruno doc string, implementation alignment table E2.M2 row) matches the comments-only kickoff decision. Server tests pass.
Documentation checked
| Path | Result |
|---|---|
docs/plans/NEO-40-implementation-plan.md |
Matches — hook sites after successful apply + on nextLevel > prevLevel; comments-only; no ILogger; time-to-first-level-up called out; single authoritative layer (HTTP handler). |
docs/decomposition/modules/E2_M2_XpAwardAndLevelEngine.md |
Matches — NEO-40 landed paragraph + backlog narrowed to NEO-41–NEO-43. |
docs/decomposition/modules/module_dependency_register.md |
N/A for diff content (no table edit); E2.M2 row unchanged, still appropriate. |
docs/decomposition/modules/documentation_and_implementation_alignment.md |
Matches — E2.M2 row includes NEO-40 landed (hook sites + plan + manual QA links); follow-on line removed. |
docs/decomposition/modules/contracts.md / client_server_authority.md / data_and_ops_policy.md |
N/A — no contract or authority change; telemetry ingest remains E9.M1 backlog, consistent with comments. |
docs/manual-qa/NEO-40.md |
Matches — API parity + comment spot-check aligns with plan. |
Register / tracking table: After merge, update the E2.M2 cell in Done. (E2.M2 snapshot + Plans column updated in-repo.)documentation_and_implementation_alignment.md to a “NEO-40 landed: …” bullet (and trim the old “Follow-on: NEO-40” line) so it matches E2_M2_XpAwardAndLevelEngine.md.
Blocking issues
(none)
Suggestions
Done.documentation_and_implementation_alignment.md(E2.M2 row): Replace the remaining “Follow-on: NEO-40” wording with a landed summary (hook sites inSkillProgressionSnapshotApi, link toNEO-40plan + manual QA), mirroring the style used for NEO-37–NEO-39 in the same cell. This satisfies the module doc’s instruction to keep that table in sync.
Nits
Nit: The implementation plan’s technical approach forDone. (level_upmentions “deltas” in the payload sketch; the in-code comment listsplayerId,skillId,previousLevel,newLevelbut not XP/total deltas. Optional one-word addition (prevXp/newXpor total XP) if you want comment parity with the plan.SkillProgressionSnapshotApilevel_uphook comment listsprevXp,newXp.)
Verification
dotnet test NeonSprawl.sln— Passed (133 tests) on review machine.- Optional: follow
docs/manual-qa/NEO-40.mdcurl steps against a running server.