neon-sprawl/docs/plans/README.md

1.2 KiB

Implementation plans (docs/plans/)

Story-level implementation plans live here, keyed by Linear issue id (NEO-*) when the work is tracked in Linear (team NEO, Neon Sprawl).

Legacy NEON-* filenames

A small number of files keep the historical Jira / Atlassian NEON-* key in the filename only. They are not the active issue tracker for new work.

  • Each such file includes a short Historical banner at the top pointing at the matching NEO-* plan (same scope) where kickoff and commits should align.
  • Prefer opening and linking NEO-* issues and plans for new contributors.

The canonical public repo path is ViPro-Technologies/neon-sprawl (see git remote). Use that org in raw GitHub markdown links (https://github.com/ViPro-Technologies/neon-sprawl/blob/main/...). The path neon-sprawl/neon-sprawl is not the live repo and will 404.

Conventions

  • New or moved plans: docs/plans/{LINEAR_KEY}-implementation-plan.md (see story kickoff).
  • Cross-links from decomposition and game-design docs should use NEO-* URLs (Linear) for current engineering work.