Code review — NEO-43 (mission / quest reward skill XP prep)

Date: 2026-05-15

Scope: Branch NEO-43-mission-quest-rewards-skill-xp (commits on top of origin/main through 2af9b1c), working tree clean at review time. Issue NEO-43.

Base: origin/main

Verdict

Approve

Summary

The branch adds a small NEO-42-style server prep slice: MissionRewardSkillXpConstants, MissionRewardSkillXpGrant.GrantFromMissionReward delegating to SkillProgressionGrantOperations.TryApplyGrant with fixed sourceKind: mission_reward, a denied-registry WebApplicationFactory plus three tests, manual QA, README, implementation plan, and an E7.M2 decomposition anchor. Behavior matches the NEO-38 grant stack and prototype catalog (salvage allows mission_reward). Risk is low: additive API, no new HTTP routes, helper unused until E7.M2 wires quest payout.

Documentation checked

Document Assessment
docs/plans/NEO-43-implementation-plan.md Matches — helper, constants, factory pattern, tests (happy + GET alignment + deny), README, manual QA, E7 anchor align with plan and kickoff decisions.
docs/decomposition/modules/E7_M2_RewardAndUnlockRouter.md Matches — new Implementation anchor (server) points to MissionRewardSkillXpGrant.GrantFromMissionReward and the NEO-43 plan.
docs/decomposition/modules/module_dependency_register.md N/A for code conflict — E7.M2 remains Planned; prep hook does not require register churn. Optional follow-up: if the team treats any server hook toward E7.M2 as “started,” consider In Progress + Summary sync (not required for correctness).
docs/decomposition/modules/documentation_and_implementation_alignment.md Matches — E2.M2 row updated: NEO-43 landed (prep) + Slice 3 still open lists NEO-44 only.
docs/decomposition/modules/E2_M2_XpAwardAndLevelEngine.md N/A — not edited; NEO-43 correctly extends the existing POST/grant story via shared operations.
docs/game-design/progression.md (referenced) Matches — README / manual QA echo mission vs combat XP separation.

Register / tracking table: Updating documentation_and_implementation_alignment.md (E2.M2 snapshot) is the main doc hygiene gap; see suggestions. Done. (E2.M2 row updated; see Suggestions §1.)

Blocking issues

None.

Suggestions

  1. Implementation tracking table — In docs/decomposition/modules/documentation_and_implementation_alignment.md, the E2.M2 row still says Slice 3 still open and links NEO-43 as future work. After this story merges, add a NEO-43 landed line (mirror NEO-42: MissionRewardSkillXpGrant, tests, manual QA, README) and adjust the “still open” list so the inventory matches the repo (per Status column rule in that file). Done. E2.M2 row: NEO-43 landed (prep) + Slice 3 still open → NEO-44 only; References column includes NEO-43 plan.

  2. E7.M2 Summary table (optional)E7_M2_RewardAndUnlockRouter.md Status remains Planned in the Summary table, consistent with the register. No change required unless you want a one-line note under Summary that server-side skill XP from quest bundles has a named hook (the new anchor already covers this). Done. Status cell notes NEO-43 prep hook; module remains Planned.

Nits

  • Nit: In NEO-43-implementation-plan.md Technical approach §1, the constant is named MissionRewardSourceKind in code, not SourceKind as in one plan sentence — trivial naming drift inside the plan only. Done. Plan now references MissionRewardSkillXpConstants.MissionRewardSourceKind (matches MissionRewardSkillXpConstants.cs).

Verification

Already run during review:

cd server && dotnet test NeonSprawl.Server.Tests/NeonSprawl.Server.Tests.csproj --filter "FullyQualifiedName~MissionRewardSkillXpGrantTests"

Author should run full dotnet test on NeonSprawl.Server.Tests before merge if not already part of CI. Manual spot-check: follow docs/manual-qa/NEO-43.md (move + POST mission_reward + deny control with trainer).