description: Planning and implementation decisions must be written back into docs (plans, README, decomposition) so Linear and the repo stay aligned.
alwaysApply: true
---
# Planning and implementation documentation
Whenever you **decide** something during **story planning** or **implementation** (architecture pick, scope cut, “option A vs B”, test strategy, resolved risk), **reflect it in documentation** in the same pass or before the story is considered done—do not leave decisions only in chat.
## Where to write
| Situation | Update |
|-----------|--------|
| Ticketed story work | **`docs/plans/{LINEAR_ISSUE_ID}-implementation-plan.md`** (e.g. `NEO-7-…`) — add or edit a **Decisions** subsection, **resolve** former open questions, refresh **Technical approach** / **Acceptance criteria** checkboxes, and **Files to add/modify** if reality diverged from kickoff. |
| Cross-cutting or module contract | Relevant **`docs/decomposition/modules/*.md`**, **`docs/game-design/`**, or **`README`** / **`server/README.md`** / **`client/README.md`** when the decision affects how others integrate. |
| Manual QA steps for ticketed story work | **`docs/manual-qa/{LINEAR_ISSUE_ID}.md`** — see **Manual QA checklist** below. |
| Review findings | **`docs/reviews/…`** when using the code-review agent; link back to the plan if the review changed direction. When feedback is fixed, **strike through + `Done.`** on the original bullets in that review file — see **Code review follow-up** below. |
## Manual QA checklist
For ticketed story work that produces **user-visible** behavior (UI, input bindings, HTTP surfaces, scene wiring, runtime config, etc.), generate a checklist at **`docs/manual-qa/{LINEAR_ISSUE_ID}.md`** (example: `docs/manual-qa/NEO-24.md`) during **implementation**—not after handoff. The checklist complements automated tests; it captures the things a human needs to exercise end-to-end against real processes (server + client, database, input hardware) that unit / integration tests do not cover.
- **When to create:** at the end of implementation, once code is stable enough to exercise. Commit it on the **story branch** alongside the implementation commits; do not defer to a separate PR.
- **When to skip:** pure refactors, docs-only changes, or stories whose acceptance is fully covered by automated tests (state that reason in one line in the plan's **Tests** section instead of creating an empty checklist).
- **File header:** a small table with **Key**, **Title**, **Linear** link, **Plan** link back to `docs/plans/{KEY}-implementation-plan.md`, and the story **Branch**.
- **Body:** **numbered sections** grouped by concern (e.g. *Setup sanity*, *Happy path*, *Edge cases / failure modes*, *No regressions*), each with **`- [ ]` checkbox bullets** that are **concrete and observable**—name the UI label, the server route, the console message, the expected state. Avoid vague asks like "test it works."
- **Coverage cues:** include at least (a) a **boot / baseline** section, (b) each **acceptance criterion** from the plan exercised by a concrete user action, (c) relevant **denial / failure** paths (HTTP 4xx, server down, invalid input), (d) **coexistence / no regressions** with neighboring features the story touches.
- **Keep it current:** if implementation reveals a new failure mode or a changed binding, update the checklist in the same commit. Any `Done.` / `Deferred` follow-ups from a QA pass belong back in the plan's **Decisions** or **Open questions**, not as strikethroughs on the checklist.
The checklist is for the **user** (or a reviewer) to execute; the agent generates it but does **not** tick the boxes on the user's behalf unless the user explicitly confirms a section was exercised.
## Code review follow-up (resolved suggestions)
When **blocking issues**, **suggestions**, or agreed **nits** from a saved **`docs/reviews/YYYY-MM-DD-*.md`** are **fixed** in code or other docs, **edit that same review file** in the **same** change-set or the **next** commit—do **not** only fix the code and leave the review implying feedback is still open.
- **In place under the original headings** (`## Suggestions`, `## Nits`, `## Blocking issues`): strike through the resolved bullet with `~~…~~`, then add **`Done.`** / **`Addressed.`** / **`Deferred…`** and a one-line note (what changed, paths, optional commit SHA). Optionally add a one-line **Follow-up** note under the title (after **Scope**/**Base**) when all suggestions are done, e.g. “suggestions below are **done** (strikethrough + **Done.**)”. Same pattern as `docs/reviews/2026-03-30-NEO-8.md`, `2026-04-05-NEO-14.md`.
- Do **not** add a **separate** “Resolved suggestions” / “Follow-up implemented” section for items that already live under Suggestions or Nits—the strikethrough row **is** the audit trail.
- Items **declined** or **deferred** to a ticket: still strike through or annotate inline under the same bullet so the review stays honest.
- Applies to **any** agent pass that implements review feedback—see [code-review-agent](code-review-agent.md) **Resolved suggestions**.
## What to capture
- **What** was chosen (or rejected) and **why** in one short paragraph or bullets.
- **Outcomes** of verification (e.g. “`dotnet test` N passed; double-dispose safe on Npgsql 10”).
- If the user **explicitly** chose an option (e.g. “Option 2”), record that label so future readers do not re-litigate.
- For **open questions** still in the plan at kickoff or mid-story, keep the **agent recommendation** alongside each item (see [story-kickoff](story-kickoff.md) **Kickoff clarifications** and **Open questions / risks**); when resolved, move the outcome to **Decisions** and clear or update the open-question row.
## Agent behavior
- After **kickoff**, the plan is living: **amend it** when implementation choices differ from the draft.
- During **implementation**, generate **`docs/manual-qa/{KEY}.md`** per **Manual QA checklist** above for any story with user-visible behavior; commit it on the story branch before handoff.
- Before **closing** or **handing off** a story, skim the plan: open questions should be **resolved** or restated as follow-up tickets with pointers, and the manual QA checklist should exist (or be explicitly declined in the plan).
- After **implementing** review feedback, **edit the corresponding `docs/reviews/…` file** with **strikethrough + Done** on the original bullets per **Code review follow-up** above—this step is easy to skip; treat it as **required** whenever suggestions were listed in that review.
This complements [story-kickoff](story-kickoff.md) (plan creation) and [code-review-agent](code-review-agent.md) (documentation checked vs plans and decomposition).