Kickoff plan for ContractCompletionOperations orchestrator, encounter hook after E5.M3 loot, and integration test coverage; Bruno HTTP loop deferred to NEO-151. |
||
|---|---|---|
| .. | ||
| architecture | ||
| decomposition | ||
| dev | ||
| game-design | ||
| manual-qa | ||
| plans | ||
| reviews | ||
Kickoff plan for ContractCompletionOperations orchestrator, encounter hook after E5.M3 loot, and integration test coverage; Bruno HTTP loop deferred to NEO-151. |
||
|---|---|---|
| .. | ||
| architecture | ||
| decomposition | ||
| dev | ||
| game-design | ||
| manual-qa | ||
| plans | ||
| reviews | ||