neon-sprawl/docs/decomposition
VinPropane 458e9b10e8 NEO-65: E3.M2 Slice 3 decomposition backlog and freeze docs
Add E3M2 prototype backlog (NEO-65–NEO-71), eight-recipe freeze table,
content/README Slice 3 CI note, and cross-links in alignment/decomposition docs.
2026-05-24 16:09:50 -04:00
..
epics NEO-45: lock prototype salvage mastery catalog, schemas, and CI. 2026-05-16 19:50:09 -04:00
milestones Initial project vision and decomposition planning baseline. 2026-03-29 16:09:57 -04:00
modules NEO-65: E3.M2 Slice 3 decomposition backlog and freeze docs 2026-05-24 16:09:50 -04:00
tooling chore: add CT content-tooling track and vision plan tooling epic 2026-03-30 23:18:40 -04:00
README.md NEO-65: E3.M2 Slice 3 decomposition backlog and freeze docs 2026-05-24 16:09:50 -04:00

README.md

Decomposition Workspace

This workspace contains detailed planning artifacts derived from the finalized master plan:

Folder Layout

Working Rules

  1. Do not rewrite baseline vision in these files; link back to the master plan.
  2. Keep slices backlog-ready (clear owner, dependencies, acceptance criteria).
  3. Use stable IDs (E1, E1.M1, etc.) for core game epics; use CT.M1-style IDs for content tooling so tooling stays out of the E1E9 sequence.
  4. Every new slice must reference telemetry and validation where applicable.

Linear alignment

Engineering work is tracked as issues in Linear (team NEO), grouped under projects that mirror epics and modules. Do not recreate a Jira-style Feature issue tier—module- or slice-level grouping is labels on the issue only.

Express that grouping with labels (for example the decomposition module idE1.M1, CT.M2, etc.). Issues belong to a project (e.g. Epic 1, E1.M1, Tech Debt); labels carry scope without a separate Feature work item.

Epic files (E1E9, master plan)

Epic Document
1 - Core Player Runtime epics/epic_01_core_player_runtime.md
2 - Skills and Progression Framework epics/epic_02_skills_and_progression.md
3 - Crafting Economy epics/epic_03_crafting_economy.md
4 - World Topology epics/epic_04_world_topology.md
5 - PvE Combat epics/epic_05_pve_combat.md
6 - PvP Security epics/epic_06_pvp_security.md
7 - Quest / Faction epics/epic_07_quest_faction.md
8 - Social / Guild epics/epic_08_social_guild.md
9 - LiveOps / Integrity epics/epic_09_liveops_integrity.md

Template for new epics or major revisions: epics/_epic_template.md

Cross-cutting tooling (not E1E9)

Track Document Modules (register)
Internal authoring & content pipeline tooling/internal_authoring.md CT.M1M3

Next Actions

  1. Expand slices into Linear issues under epic/module projects when writing a prototype backlog (docs/plans/E*M*-prototype-backlog.md) — create all issues and blockedBy links in the same decomposition pass, not at story kickoff. Set estimate 1…N on each issue to match slug execution order so the project board can sort by Estimate (ascending). Tag module / slice scope with labels (not a duplicate Feature tier). Keep module IDs aligned with the master plan.
  2. Populate modules/module_dependency_register.md as contracts stabilize.
  3. Refine milestones/phase_execution_plan.md with dates and owners when execution starts.