neon-sprawl/docs
VinPropane 103f8bbe19 NEON-29: Add approach treads for green, gold step, violet terrace.
TerracePlatformC_Approach (PCS_*): four cardinals, 7.2 m arms, ~0.104 m rise.
TerraceStepB_Approach (TSB_*): S/E/W, 6.2×1.0 m NS treads.
TerracePlatformB_Approach (TPB_*): N/E/W with six risers for 0.6 m to floor;
south uses existing gold step. New ramp-tint materials. README + plan.
2026-04-12 16:43:02 -04:00
..
architecture docs: documentation vs implementation alignment (#7) 2026-03-30 19:03:03 -04:00
decomposition NEON-28: drop freed occluder keys without material restore 2026-04-10 23:09:12 -04:00
game-design chore: document governing design axioms (fun, cyberpunk theme) 2026-04-04 18:46:55 -04:00
plans NEON-29: Add approach treads for green, gold step, violet terrace. 2026-04-12 16:43:02 -04:00
reviews NEON-28: Dev obstacle smoke, nav reparent on hide, and docs 2026-04-10 23:55:50 -04:00