Commit Graph

6 Commits (f4e9f62533dc8c4d499af88f99a45b17c216caac)

Author SHA1 Message Date
VinPropane 7695527a79 NEO-75: address code review doc consistency findings
Update E3.M1/M3 status rows, epic Slice 5 completion note, README HUD
paths, E3S5-04 collapse AC, and strike through resolved review items.
2026-05-24 20:35:32 -04:00
VinPropane 977bcc3b27 NEO-75: capstone manual QA, README loop docs, alignment
Add zero-Bruno gather→refine→make checklist, end-to-end README section,
and mark Epic 3 Slice 5 client capstone complete in module docs.
2026-05-24 20:33:51 -04:00
VinPropane c16b610468 NEO-74: Implement client craft UI, recipe list, and tests.
Add recipe-definitions and craft HTTP clients, scrollable recipe panel with
Craft buttons, CraftFeedbackLabel, refine skill HUD row, GdUnit coverage,
manual QA, and plan/module doc reconciliation.
2026-05-24 19:56:38 -04:00
VinPropane adca7befe0 NEO-73: add manual QA and reconcile implementation plan.
Document gather HUD behavior in client README; mark E3S5-02 AC complete.
2026-05-24 19:07:22 -04:00
VinPropane 8e44d81537 NEO-72: reconcile plan, E3S5 backlog, and module alignment docs.
Mark acceptance criteria complete and document landed client inventory HUD.
2026-05-24 18:41:24 -04:00
VinPropane 2cd17e293a chore: Epic 3 Slice 5 client backlog and full-stack epic policy
Add E3S5-client-prototype-backlog (NEO-72–NEO-75), epic_03 Slice 5,
full-stack epics rule in decomposition README, and cross-links from
E3 module docs and prototype backlogs.
2026-05-24 16:16:51 -04:00