VinPropane
|
0d089a6dff
|
NEO-152: Add comment-only contract telemetry hook sites.
Anchor contract_issued, contract_complete, and reward_anomaly
for E9.M1; document hooks in server README and module docs.
|
2026-06-28 12:08:05 -04:00 |
VinPropane
|
56bc22c70d
|
NEO-145: address review findings — tests and decomposition docs.
Rename cross-ref unit test; add loader freeze-overflow and missing-schema
negatives; update E7.M4/CT.M1 alignment tables and strike through review.
|
2026-06-20 19:36:25 -04:00 |
VinPropane
|
2afd29e4d9
|
NEO-144: document contract catalog CI and reconcile plan
Update content README, module docs, alignment register, and backlog AC for E7M4-01 land.
|
2026-06-20 19:18:58 -04:00 |
VinPropane
|
4238038e11
|
NEO-144: add E7M4 Slice 4 pre-production backlog
Land NEO-144–NEO-154 story order, freeze table, and cross-link from E7M3 downstream.
|
2026-06-20 19:15:56 -04:00 |