Commit Graph

2 Commits (9b11a521d86f645d9334a692862defac4ff415ff)

Author SHA1 Message Date
VinPropane 9b11a521d8 NEO-76: Add prototype ability catalog, schema, and CI gates.
Freeze four AbilityDef rows in content with validate_content E5M1
allowlist; document freeze in E5.M1, content README, and CT.M1.
2026-05-24 21:08:16 -04:00
VinPropane 510d71113b NEO-76: decompose E5.M1 prototype backlog (NEO-76–NEO-86, NEO-44).
Add full-stack Epic 5 Slice 1 story backlog with Linear issues, blockedBy
graph, and module/epic register cross-links.
2026-05-24 21:02:07 -04:00