Commit Graph

5 Commits (44e0056b37f122d04a369364ea5d55fada3e5ff7)

Author SHA1 Message Date
VinPropane 2cd17e293a chore: Epic 3 Slice 5 client backlog and full-stack epic policy
Add E3S5-client-prototype-backlog (NEO-72–NEO-75), epic_03 Slice 5,
full-stack epics rule in decomposition README, and cross-links from
E3 module docs and prototype backlogs.
2026-05-24 16:16:51 -04:00
VinPropane 458e9b10e8 NEO-65: E3.M2 Slice 3 decomposition backlog and freeze docs
Add E3M2 prototype backlog (NEO-65–NEO-71), eight-recipe freeze table,
content/README Slice 3 CI note, and cross-links in alignment/decomposition docs.
2026-05-24 16:09:50 -04:00
VinPropane 011289a154 chore: decompose E3.M1 Slice 2 gather backlog (NEO-57–64)
Epic 3 Slice 2 follows completed E3.M3 inventory work: eight-story
backlog, expanded module doc, register note, and Linear issues for
resource nodes, yields, depletion, and gather integration.
2026-05-24 13:43:23 -04:00
VinPropane 0ce952131a NEO-50: Address review — equip_stub gate by role, backlog sync. 2026-05-17 21:29:32 -04:00
VinPropane 56233bfe2c NEO-50: Add E3.M3 prototype backlog and decomposition doc links.
Documents Epic 3 Slice 1 story order (NEO-50–NEO-56), frozen prototype item ids,
and register/module pointers for ItemizationAndInventorySchema.
2026-05-17 21:15:42 -04:00