Commit Graph

6 Commits (2afd29e4d97aed9a2ab1b29db8c9758931dfa36c)

Author SHA1 Message Date
VinPropane c7a9e81067 NEO-144: align Epic 7 decomposition docs with E7M4 backlog
Update module status, freeze table, register, and Slice 4 DoD links for contract generator work.
2026-06-20 19:15:58 -04:00
VinPropane 718346163f NEO-133: kickoff E7M3-01 — faction catalog schemas + CI plan
Land E7.M3 Slice 3 decomposition docs and NEO-133 implementation plan
before content/schema work; blocks NEO-134 server faction load.
2026-06-14 14:51:22 -04:00
VinPropane 85ead01a0b chore: Decompose E7.M2 prototype backlog (NEO-124–NEO-132).
Epic 7 Slice 2 reward router: nine server+client stories, Linear
issues, module docs, and kickoff defaults for completion bundles.
2026-06-07 15:11:43 -04:00
VinPropane 140d857398 NEO-112: add E7M1 prototype backlog and decomposition cross-links 2026-05-31 21:13:03 -04:00
don 8199dab748 Complete Neon Sprawl rename and server project defaults.
Remove legacy vision plan filename; epics already reference neon_sprawl_vision.plan.md.
Add launchSettings and appsettings for NeonSprawl.Server.

Made-with: Cursor
2026-03-29 17:24:35 -04:00
don b616b741ac Update module dependency register and README with new epic documentation and refined next actions. Added SecurityTierZoneFlags module and clarified dependencies in the planning documents. 2026-03-29 16:47:37 -04:00