Commit Graph

4 Commits (0e5bbbff2e1f8c0c4f8ea5ffa073b0587d4fcdbe)

Author SHA1 Message Date
VinPropane b9644a0453 NEO-79: Reconcile plan and E5M1 backlog for ability registry DI. 2026-05-24 22:05:27 -04:00
VinPropane 7c2697e4cc NEO-77: Reconcile plan and module docs for E5M1-02 server load. 2026-05-24 21:40:58 -04:00
VinPropane 9b11a521d8 NEO-76: Add prototype ability catalog, schema, and CI gates.
Freeze four AbilityDef rows in content with validate_content E5M1
allowlist; document freeze in E5.M1, content README, and CT.M1.
2026-05-24 21:08:16 -04:00
VinPropane 510d71113b NEO-76: decompose E5.M1 prototype backlog (NEO-76–NEO-86, NEO-44).
Add full-stack Epic 5 Slice 1 story backlog with Linear issues, blockedBy
graph, and module/epic register cross-links.
2026-05-24 21:02:07 -04:00